Tensile machine new customer training
恒旭是一家負責任的企業(yè)。對于對于剛剛購買力拉力試驗機的客戶來說,要急于解決的問題是讓操作人員盡快掌握它拉力試驗的操作步驟、方法以及試驗中需要注意的細節(jié)。如果不進行系統(tǒng)的培訓,既浪費時間又有可能傷害到拉力機。因此,恒旭會派專業(yè)的技術(shù)人員對操作人員進行培訓。只有這樣我們才能在短的時間內(nèi)把操作拉力試驗機的技術(shù)*掌握,才能盡快的進行材料的拉力測試,讓產(chǎn)品盡量更快的投入生產(chǎn)。下面恒旭小編就把培訓的內(nèi)容簡單的介紹一下,希望對大家有所幫助。
Hengxu is a responsible enterprise. For customers purchasing power for just a tensile testing machine, the desire to solve problems is to allow operators to master it as soon as possible the operation steps and methods of the tensile test and trial need to pay attention to details. Without systematic training, it is a waste of time and can hurt the pull machine. Therefore, hengxu will send professional technicians to train operators. Only in this way can we fully grasp the technology of the operation tensile testing machine in the shortest time, so as to carry out the tensile test of materials as soon as possible, so that the product can be put into production as quickly as possible. Here is a brief introduction of the training. I hope I can help you
一、拉力試驗機的操作步驟
Ⅰ、 Operation procedure of tensile testing machine
1、如果想要完整的完成整個拉力試驗,那么我們需要對拉力試驗機的操作過程“了如指掌”,我們首先仔細閱讀拉力機的使用說明書。當我們對拉力機了解之后就跟著技術(shù)人員一起進行拉力試驗。
1. If we want to complete the whole tension test, we need to know the operation process of the tensile testing machine, and we will first read the instruction manual of the pull machine carefully. When we learned about the pull machine, we followed the technicians to carry out the tension test.
2、步先打開電腦上的軟件測控系統(tǒng),再打開試驗機電源。根據(jù)欲進行的試驗選擇相應(yīng)的試驗類型。
2. The first step is to open the software measurement and control system on the computer, and then turn on the test machine power. Select the test type according to the experiment.
3、然后選擇適當?shù)乃俣仁乖囼灆C升降運行一下,確定各系統(tǒng)運行正常。
3. Then select the appropriate speed to lift the test machine up and down to make sure the system is operating normally.
4、依據(jù)要進行的試驗的次數(shù),新建出相應(yīng)的試驗記錄條數(shù);并填入相應(yīng)的批號、編號、試驗環(huán)境、試樣尺寸等相關(guān)數(shù)據(jù)。
4. According to the number of trials to be conducted, the corresponding test record number shall be created. Fill in the corresponding batch number, number, test environment, sample size and other relevant data.
5、在拉力機夾具上夾緊要試驗的材料。
5. Clamping the material of the critical test in the tension machine clamping device.
6、根據(jù)試驗所需要的試驗力和變形的范圍,選擇合適的試驗力和變形的檔位(量程)。
6. According to the test force and the range of deformation required by the test, select the appropriate test force and the deformation gear (range).
7、清零:將試驗力、變形、位移清零。
7. Clear zero: the test force, deformation and displacement are zero.
8、準備工作完畢之后,點擊開始按鈕進行拉力試驗。
8. After the preparation, click the start button to carry out the tension test.
9、待試驗被拉斷之后,保存得出的數(shù)據(jù)結(jié)果或者打印。
9. After the test is pulled off, save the data result or print.
10、關(guān)閉電源。
10. Turn off the power.
二、操作拉力試驗機的時候要注意的細節(jié)
1、實驗前先檢查拉力機工作臺是否放置平穩(wěn)。
2、夾具必須將試驗材料夾具,防止脫落。
3、傳感器的連接線路要定期的檢測和保養(yǎng)。
4、試驗機的軸承部位要定期的加潤滑油。
Ⅱ、Attention to detail when operating tension testing machine
1. Check the bench of the pull machine before the experiment is stable.
2. The fixture must be clamping the test material to prevent shedding.
3. The connection line of the sensor should be tested and maintained regularly.
4. The bearing part of the test machine should be lubricated regularly
三、要會對拉力試驗機的故障進行排查和解決
1、當拉力機出現(xiàn)問題的時候我們要對它進行故障分析,看看是哪里出現(xiàn)問題。
2、在出現(xiàn)問題的地方可以維修也可以更換新的零件設(shè)備。
3、如果實在找不出故障的原因,應(yīng)該立即電話咨詢生產(chǎn)廠家,讓技術(shù)人員幫我們解決。
Ⅲ、The failure of tensile testing machine should be checked and solved
1. When the tension machine is in trouble, we will analyze it and see where the problem occurs.
2. Can repair or replace the new parts equipment in the area where there are problems.
3. If there is no reason for the failure, we should call the manufacturer immediately and ask the technician to help us solve it.